Base Camp/Production & Execution/Project & Operational Project Deck Production SOP

Project & Operational Project Deck Production SOP

Updated January 20, 2025 View in Google Drive
decksproject deckoperational deckproduction slidesaddendum

Project Deck: Production Slides

From the beginning of a project, the Production team should be building production slides in the Project Deck, outlining any and all production-specific elements ranging from permitting considerations to catering rentals.

The Production Addendum outlines different categories that should be included whenever applicable, along with slide templates. Notes on category slides detail when different elements should be incorporated.

When in doubt, err on the side of oversharing. The more transparency with internal teams and clients, the more likely you'll be set up for success onsite with a fully aligned team.

Operational Project Deck

Three weeks out from load-in (if not sooner), the Project Deck should be reorganized to serve as an operational manual for the activation. This is not a new deck — it is the Project Deck rearranged to serve the team operationally.

Organization led by Account and Production, with Creative Strategy & Creative support.

Structure

  1. General/Strategic Overview (led by Account & Creative Strategy)
    • Activation Name, General Description & Schedule
    • Key Strategy
  2. Creative Overview (led by Creative)
    • Key Graphic Elements
    • Key Renders & Floorplan(s)
  3. Operational Overview (led by Production with Account support)
    • Always On Operations — all applicable production slides transitioned from Project Deck
    • Programming Specific Operations — specific programming elements detailed by day

The Operational Project Deck should be printed and a limited number of copies available onsite.

Key Contacts

JC

Johnathon Cramer

Head of Production